In this lesson, we will see the most used SAP PP transactions with a brief explanation of their purpose.
There are many more, but in most of the implementations, these are the only ones that are used.
Material Master
- MM01: Creation of a new Material (immediately).
- MM02: Change of an existing Material.
- MM03: Display of an existing Material.
- MM06: Flag for deletion of an existing Material.
- MM17: Mass change of existing Materials.
- MMAM: Change of the Material Type of an existing Material.
- MMD1: Creation of a MRP Profile.
- MMD2: Change of an MRP Profile.
- MMD3: Display of an MRP Profile.
- MMD6: Deletion of an MRP Profile.
Batch Master
- MSC1N: Creation of a Batch Record.
- MSC2N: Change of a Batch Record.
- MSC3N: Display of a Batch Record.
Production Versions
- C223: Production Versions Maintenance (Creation, Change, and Display)
Bills of Materials (Material BOMs)
- CS01: Creation of a Bill of Material.
- CS02: Change of a Bill of Material.
- CS03: Display of a Bill of Material.
Work Centers
- CR01: Creation of a Work Center.
- CR02: Change of a Work Center.
- CR03: Display of a Work Center.
- CA85: Replace of a Work Center.
- CR11: Creation of a Capacity.
- CR12: Change of a Capacity.
- CR13: Display of a Capacity.
- CR21: Creation of a Hierarchy of Work Centers.
- CR22: Change of a Hierarchy of Work Centers.
- CR23: Display of a Hierarchy of Work Centers.
Routings
- CA01: Creation of a Standard Routing.
- CA02: Change of a Standard Routing.
- CA03: Display of a Standard Routing.
- CA11: Creation of a Reference Operation Set.
- CA12: Change of a Reference Operation Set.
- CA13: Display of a Reference Operation Set.
- CA21: Creation of a Rate Routing.
- CA22: Change of a Rate Routing.
- CA23: Display of a Rate Routing.
- CA31: Creation of a Reference Rate Routing.
- CA32: Change of a Reference Rate Routing.
- CA33: Display of a Reference Rate Routing.
Engineering Change Management
- CC01: Creation of an Engineering Change Number.
- CC02: Change of an Engineering Change Number.
- CC03: Display of an Engineering Change Number.
Demand Management
- MD61: Creation of Planned Independent Requirements (PIRs).
- MD62: Change of Planned Independent Requirements (PIRs).
- MD63: Display of Planned Independent Requirements (PIRs).
MRP (Materials Requirements Planning)
- MD01: Total Planning online.
- MDTB: Total Planning as Background Job.
- MD02: Multilevel Single-Item Planning.
- MD50: Single-Item Planning for a Sales Order Item.
- MD51: Single-Item Planning for a Project WBS.
- MD01N: MRP Live.
- MD04: Stock/Requirements List.
- MD05: MRP List.
- MD06: MRP List (collective display).
- MD07: Stock/Requirements List (collective display).
Planned Orders
- MD11: Creation of a Planned Order.
- MD12: Change of a Planned Order.
- MD13: Display of a Planned Order.
Production Orders
- CO01: Creation of a Production Order for a Material.
- CO07: Creation of a Production Order without Material.
- CO40: Creation of a Production Order from a Planned Order.
- CO41: Collective conversion of Planned Orders.
- CO08: Creation of a Production Order for a Sales Order.
- CO10: Creation of a Production Order for a Project.
- CO02: Change of a Production Order.
- CO03: Display of a Production Order.
- COHV: Production Orders Mass Processing.
Capacity Leveling
- CM21: Planning Table (Graphical) with Work Center view.
- CM22: Planning Table (Tabular) with Work Center view.
Goods Movements
- MF60: Material Staging with Pull List.
- CO27: Material Staging with Pick.
- COPAWA: Picking with HU.
- MIGO: Goods Issue and Goods Receipts (creation and display).
- COB1: Creation of a Batch Search Strategy.
- COB2: Change of a Batch Search Strategy.
- COB3: Display of a Batch Search Strategy.
Confirmation
- CO11N: Time Ticket Confirmation.
- CO12: Collective Entry of Confirmations.
- CO15: Confirmation for a Production Order.
- CO14: Display of a Confirmation.
- CO13: Cancel of a Confirmation.
Reporting
- COOIS: Production Order Information System.